Pre-Engineering and Feasibility Studies

 

Pre-Engineering and Feasibility Studies are consist of 2 Phases;

 

  • Phase 1 comprising a Pre-Feasibility Report evaluating state-of-the-art technologies,

  • Phase 2 preparation of a Bankable Feasibility Study comprising:

           

        a) Site visit and preparation of the conceptual design,

        b) Preparation of an economic assessment of the Project,

        c) Listing of Licences and Permits,

        d) Basic review and assessment of the Turkish Power Market,

        e) Preliminary project Risk Assessment,

         f) and a Turkish Import Coal Market analysis