ONGOING  PROJECTS

 

Linerji is heavily active on energy and mining sectors in Turkey and is also actively working in CIS region. As Linerji has offices in Georgia and Kazakhstan, she is also very active in CIS region. With the support of her international partners, Linerji also involve projects worldwide.

GE/RGT 6FA WORK BENCH, RYBINSK, RUSSIA

Client : AECOM

 

  • Expert services for design review and owners engineering Services for GE & RGT JV 6FA Gas Turbines Factory installation.

660MW PCC CFPP PROJECT ORLOV, KAZAKHSTAN

Client : Samruk Energy & Vitrum JV

  • Concept design and prefeasibility studies

  • Observation of the location and alternative technology options have been analyzed

  • Orlov Mine pre-engineering study has been performed.

  • 600MW SC mine integrated Project prefeasibility study performed.

  • CFB and PCC options are evaluated.

  • Ultra super Critical, SuperCritical and SubCritical options are analyzed

85MW PARAVANI HEPP PROJECT PARAVANI, GEORGIA

Client : AEH

 

Owners Engineering Services

 

  • Design review, check and approve manufacturers main equipment, review and approve site instructions, handling non conformities, providing supervision in establishing project documentation.

 

Site Supervision Services

 

  • Supervision of day to day activities at site by means of Civil, geological, quality and HSE point of view including tunnel works and all civil structures. This task is undertaken by our company Hidrolin, based in Georgia, established by Linerji and Hidrodizayn partnership.

 

 

 

 

155MW KONYA OIZ CCGT CHP PROJECT KONYA, TURKEY

Client : KOS 

Power Market Study TURKEY + Pre-Feasibility and Conceptual Engineering + Bankable Feasibility 

 

  • Power market survey and electricity and natural gas market evaluation

  • Estimation of generation and consumption trends, electricity and natural gas prices forecast  

  • initially planned 155 MW CCGT  power plant is optimized according to market conditions and 55-60 MW CCGT with cogeneration ability is designated.

  • Pre-Engineering & Design Studies have been prepared by Linerji.

  • Single line diagrams, heat and  mass balance diagrams, layout, project  risks project EPC time schedule and plant performance analysis have been evaluated and engineered.  

2X660MW YUMURTALIK PCC CFPP PROJECT ADANA, TURKEY

Client: ÇALIK HOLDING

 

  • 1320 MW SC PCC imported coal fired power plant project is composed of 2 x 660 MW boiler systems

  • Pre-Engineering & Design Studies have been prepared by Linerji.

  • 4x660MW and 6x660MW capacity options are evaluated.

  • SuperCritical and Ultra Super Critical technology options evaluated

  • A very detailed electricity analysis have been performed by means of all capacity options.

520MW SEDKO CCGT PROJECT KIRKLARELI, TURKEY

Client : Üründül Group & MHI 

Owners Engineering & Site Supervision 

 

  • Detailed Design Review of 520MW Combined Cycle Gas Turbine Kırklareli Sedko Project. All Detailed design review services will be executed with Pöyry&Linerji.

 

  • Site supervision services will be executed by all means of Project Management, Commissioning, Mechanical - Electrical Supervision, I&C and Civil Engineering.

>40MTON COAL MINE PROJECT ZONGULDAK, TURKEY

Client : SOMA HOLDING

>30MTON COAL MINE PROJECT AMASYA, TURKEY

Client : SOMA HOLDING

  • Technical support during the drilling works at site 

  • JORC standard resource evaluation study

 

  • Technical support during the drilling works at site 

  • JORC standard resource evaluation study

CopyRight (C) 2014.